Built 2025
Banjulinding
Residential and commercial, Banjulinding
| Buildings | 2 |
| Residential block | 300 m² over two storeys |
| Commercial block | 308 m² over two storeys |
| Total floor area | 608 m² |
| Our role | Subcontractor |
| Our scope | Foundations and superstructure |
| Main contractor | GIGO Construction |
| Completed | 2025 |
Two buildings in Banjulinding, completed in 2025: a two-storey residence of 300 m² and a two-storey commercial building of 308 m².
Golden Head Innovates was engaged as subcontractor for the foundations and the full superstructure — everything above ground level, including frame, floor slabs, blockwork and balconies.
The structure

Next project
Jalambang
A six-bedroom house in Jalambang, completed in 2022 and taken from first drawing to handover of keys.